Design of industrial buildings One of the most difficult types of design work is the design of industrial buildings. A large amount of work, complex calculations - this is what the developers of such projects face. To solve such problems, a team of designers with high qualifications and a good reputation in the service market, who know the specifics of the technological process of future production, is needed.
Terms of project development- Pre-design study of the project, draft design, feasibility study from 20 days
- Development of design documentation from 30 days
- Passage of state and non-state expertise of project documentation from 30 days
- Development of working documentation from 45 days
- Inspection of buildings and structures (during reconstruction or re-profiling of an object) from 15 days
ORDER DESIGN SERVICES
The cost of industrial construction projects depends on the complexity of technological processes and the size of production. When calculating the cost of design work, we focus on the basic indicators of labor intensity and cost of work (based on state estimate standards). The market value of project development is set on a contractual basis. The terms of the work are agreed with the customer, but do not exceed the standard terms for this type of objects.
Design objectsIndustrial buildings are basic, where the technological process takes place, and auxiliary, designed to perform economic, administrative, and other functions. Production facilitiesThese include the main and auxiliary premises of factories, workshops, factories. Energy facilitiesThese are CHPPs, transformer substations, boiler houses, recycling water supply facilities and other energy facilities that require a special approach to operational safety. Transport and warehouse complexesThey include warehouses, terminals, locomotive depots, sites where material resources are stored, related infrastructure, gas stations, service points. Usually one-story buildings are located in the center of the territory of enterprises. Administrative, household buildings These are office buildings (engineering, laboratory, personnel), which are the facade of the enterprise. They are designed taking into account the purpose, type, area of buildings, the number of employees, their convenience in the building.
|
| | |
Design stagesThe main stages of development of design documentation for industrial facilities: Pre-design stage.Development of a feasibility study. Selection of basic technological solutions and selection of equipment in accordance with the technical specifications of the Customer. Project documentation (PD).The stage of developing constructive, technological, architectural and planning solutions without detailing. The choice of optimal engineering networks, equipment. Determination of the organization of work at the construction site, estimates, etc. Expertise of design documentation.Working documentation. Detailed study of all sections. Designer supervision (mandatory - for hazardous objects). Composition of the documentationAccording to the legislation, project documentation consists of: - explanatory note;
- schemes of the planning organization of the land plot;
- architecture solutions;
- volumetric planning, design solutions;
- information about engineering networks and equipment, a list of development activities;
- PIC;
- list of measures for environmental protection;
- organization of work on demolition, dismantling of structures (if necessary);
- measures to ensure energy efficiency, fire safety;
- estimates;
- other documentation.
Design MethodsThe main method for developing projects for buildings in various industries is the widespread use of standard structures. All planning and design decisions are based on unification, that is, standard solutions from modules that form separate cells, which are structurally repeated. Projects are created using graphic, model-graphic, model-model methods, electronic equipment. |
|
Features of the design of industrial buildingsWhen creating projects for industrial facilities, 2 important factors are taken into account: Functional requirements.They determine the future type of indoor production, technological loads, operating mode, etc. Technological solutions determine the conditions for creating engineering networks, planning premises, choosing building materials, and finishing. Economic expediency Ensuring the optimal combination of construction costs with the timing, quality of development, and compliance with customer requirements. Design of hazardous industrial buildings, their classification The documentation should be developed by designers with a license to work, since in the event of an accident, objects are dangerous to the life, health of citizens, and the environment. The PD of newly erected hazardous structures must undergo an examination, and the existing ones (during reconstruction, liquidation, conservation) are assessed for industrial safety. Construction and installation work at the facilities must be carried out under the supervision of the designer. Such objects are divided into 4 classes, which determine their degree of danger:Class I - extremely dangerous; II class - high hazard; III class - medium hazard; IV class - low hazard. Basic design solutionsIndustrial design is distinguished by the need to develop a technological section of the project. This requires the preparation of a scheme of technological processes, selection of equipment, calculation of current loads, determination of energy carriers, a logistic scheme of production, a raw material base. Fire safety standards, transport accessibility are taken into account. Security, architecture featuresThe peculiarity of the creation of industrial facilities is their difference from other types of buildings due to the fact that they experience heavy loads. They are regulated by SNiPs, Codes of Rules, which determine the degree of fire resistance of buildings, withstand chemical and thermal loads, and moisture resistance. The main task is to provide a safe, comfortable environment for employees, the practicality of an enterprise with convenient approaches to it, logistics, storage conditions, and a good microclimate. The architecture in this case is less important, it is usually typical. UnificationThe design of industrial buildings and structures for the most part is carried out according to modern standard projects, which differ in that they are unified. That is, they are ready for construction by using more versatile, economical elements of structures, selected according to certain criteria. Unification consists in the selection of universal design solutions that have shown a great economic effect in practice. |
|
|